Pre-Feasibility Study: Calueque - Oshakati Water Pipeline Project

Project Brief

Funding for the project is provided by the EU-Africa Infrastructure Trust Fund through KfW Development Bank. The project will analyse the present situation of the Calueque – Oshakati canal in detail and will provide feasible options for improvements.The services to be rendered by the consultant comprises the preparation of a Pre-Feasibility Study, covering the following aspects: a) Situation analysis of the sources and the bulk water supply infrastructureb) Analysis of the historical water demand and future demand projectionsc) Preparation of a proposal for canal replacement or other alternative solutionsd) Analysis of the financial aspects, including a cost estimate for the overall project implementation as well as operation and maintenance costse) Preparation of a detailed environmental impact assessment including the possible effects of climate change Preparation of an overall project implementation schedule covering all relevant activities and phases for the overall project implementation.

Engineer(s)

Engineering Discipline

Systems Engineering

Systems engineering is an interdisciplinary field of engineering that focuses on how to design and manage complex engineering projects over their life cycles. Issues such as reliability, logistics, coordination of different teams (requirements management), evaluation...Read more

Member Project

Von-Bach to Windhoek Water Transfer Scheme

User-Client: Namibia Water Corporation Ltd

Contractor: EMS Contractors

Contract Status:  Completed November 2014

Contract Value: N$ 200 million

•    Each of the three pump stations is equipped with four 1200 kW 690 V water-cooled motors powering...Read more